CRE Details
-
CRE Identifier:
CRE-099
Title of CRE:
Introduction of a new interface between the ESE and LOWFS
CRE Class:
Status
Paused
CRE Owner
Sharepoint Link
Affected Documents listed in CRE
No Associated Documents Listed!
New/Updated Documents listed in CRE
No New Documents Listed!CRE Notes
- 2024-07-29 VW: CRE created and emailed to Rory. The LOWFS mechanical interface to be moved from the ISB to ESE to result in a more efficient structural layout of the NGSS.
- 2024-09-23 VFW: New interface dwg uploaded for Tom to review from the LOWFS side.
- 2024-10-14 VFW: The LOWFS ICD is signed off and so CRE 099 is ready to progress to its next step.
- 2025-01-16 VFW: Accepted for Implementation. Calum to speak to Kjetil, possibly accept DARS are out of date - possibly partial implementation.
- 2025-02-19 VFW: Calum - Change classified as Class 2 on the basis that this in an interface internal to the NGSS system without impact to Instrument-level form, function or performance. Change therefore managed by NGSS system engineer. As the introduction of a new drawing, at Rev A, approvals are simply captured by drawing signatures. I have reviewed and can confirm all present, and all identified stakeholders approve. At this time (February 2025) this change will only be partially implemented: the new drawing will be released, but other impacted documentation (i.e. relevant req. specs., MAIT plans, DARs, etc.) will not be updated to include new references, do to present uncertainty related to the project re-scope and system redesign. Following issue of the drawing, this CRE will be indefinitely paused, and may later be cancelled entirely (TBD).