Change Requests Summary
CRE Database last updated on: 2025-03-31 15:53:59
CRE Status
Number
Paused
7
Cancelled
6
Awaiting CCB Review
1
Populated - In Progress
3
Accepted for Implementation
15
Rejected - Pending rework
3
Implemented and Closed
82
Rejected and Closed
8
Change Request Database
CRE ID
CRE Title
Owner
Status
Class
Open For
Details
CRE-064
Changes to NGSS Requirement Documents post FDR1
Kjetil Dohlen
Paused
Class 1
818 Days
CRE-066
ISS top frame to test frame mechanical ICD
Jonathan Strachan
Cancelled
Class 2
755 Days
CRE-067
IFS requirements update
Anna MacIver
Paused
750 Days
CRE-077
ICR to IPO thermal interface drawing updates
Anna MacIver
Cancelled
678 Days
CRE-081
Thermal interface between ISDS, ICR and ISP
Anna MacIver
Paused
Class 2
581 Days
CRE-085
Update to IFS and ICR Space Envelope
Anna MacIver
Cancelled
Class 2
504 Days
CRE-086
Update to IFS internal co-ordinate systems
Anna MacIver
Paused
Class 2
483 Days
CRE-087
Update to IFS and ISP interface drawings
Anna MacIver
Cancelled
Class 2
478 Days
CRE-090
FPRS Window Panes
Jonathan Strachan
Cancelled
Class 1
395 Days
CRE-091
Update to IFU - ICR Mechanical Interface drawing
Cancelled
374 Days
CRE-097
Additional Interfaces for TE AIT
Paused
273 Days
ET-1416
Modification of HARMONI Straylight Requirement
Paused
269 Days
CRE-099
Introduction of a new interface between the ESE and LOWFS
Paused
248 Days
CRE-093
Change to NGSS external volume allocations
Kjetil Dohlen
Awaiting CCB Review
318 Days
CRE-070
ISP requirements update
Anna MacIver
Populated - In Progress
750 Days
CRE-083
Additional Interface between FPMW and Masks
Anna McIver
Populated - In Progress
Class 1
549 Days
RFD-001 (CRE-103)
NIR Camera Wavefront Error
Populated - In Progress
308 Days
CRE-102
Update of Optical ICD Between IPO and IFU
Accepted for Implementation
20181 Days
ET-1223
INS Control System V3
Accepted for Implementation
1418 Days
ET-1167
New Version of the Common Requiremenets for ELT-Instruments
Accepted for Implementation
1284 Days
CRE-056
Five Lens Design IR Camera
Accepted for Implementation
1171 Days
CRE-057
Removal of LSF Calibration Hardware
Fraser Clarke
Accepted for Implementation
Class 1
1023 Days
ET-1273
New and Updated Ads for RTC, ICS and Network Infrastructure
Beth Johnson
Accepted for Implementation
Class 1
952 Days
CRE-075
Clarification of IRW Parking and Interlock Requirements
Beth Johnson
Accepted for Implementation
720 Days
CRE-080
ICR Requirements update (post CDR2)
Anna MacIver
Accepted for Implementation
636 Days
ET-1373
HARMONI Image Quality requirement update
Phil Rees
Accepted for Implementation
Class 1
610 Days
CRE-092
Change of minimum exposure time requirement
Fraser Clarke
Accepted for Implementation
Class 1
335 Days
CRE-094
IFS vibration testing specification
Accepted for Implementation
304 Days
RFD-005 (CRE-104)
Cabinet Smoke Detectors
Beth Johnson
Accepted for Implementation
Class 1
304 Days
RFD-006 (CRE-105)
ISS Access Walkway Widths
Jonathan Strachan
Accepted for Implementation
Class 1
304 Days
ET-1475
Add Vacuum and Cryogenics Standard V7 to CDL HARMONI
Accepted for Implementation
268 Days
ET-1497
Accelerations Applicable to Re-Assembly, Integration and Maintenance HARMONI
Accepted for Implementation
239 Days
ET-754
System Mass
Implemented and Closed
Closed
CRE-001
Pre-Optics to IFU interface change
Hermine Schnetler
Implemented and Closed
Class 2
Closed
ET-324
version 2 of ICS Common Requirements ESO-264642
Implemented and Closed
Closed
ET-541
Glycol Cooling Connectors Size
Implemented and Closed
Closed
ET-676
MICADO Volume Change
Implemented and Closed
Closed
ET-552
Change to INS Common ICD and SCP
Implemented and Closed
Closed
ET-303
Change to Common ICD ESO-253082 version 2
Implemented and Closed
Closed
CRE-002
Configuration Management Plan Update v2 to v3
Andy Born
Implemented and Closed
Class 2
Closed
CRE-003
Additional Nasmyth Interface Points
Fraser Clarke
Implemented and Closed
Class 1
Closed
CRE-004
System Mass
Fraser Clarke
Implemented and Closed
Closed
CRE-005
LGSS Asterism Change
Anne Costile
Implemented and Closed
Class 1
Closed
CRE-008
Spectrograph Gratings
Matthias Tecza
Implemented and Closed
Class 1
Closed
CRE-007
LTAO: change to separate LGS dichroic from FPRS window unit
Fraser Clarke
Implemented and Closed
Class 1
Closed
CRE-009
IFU Mountings
Magali Loupais
Implemented and Closed
Class 1
Closed
CRE-010
2nd order J high-resolution Gratings
Matthias Tecza
Implemented and Closed
Closed
CRE-011
FPRS-to-ISS Interface Change
Patrick Smith
Implemented and Closed
Class 1
Closed
CRE-012
Cold Volume Thermal Control
Kjetil Dohlen
Implemented and Closed
Class 1
Closed
ET-850
Change to Common Interface between Nasmyth instruments and the rest of the E-ELT system
Implemented and Closed
Closed
CRE-015
Revision of FPRS-Related Requirements
Fraser Clarke
Implemented and Closed
Class 1
Closed
ET-818
Change to HARMONI DV DWGs
Implemented and Closed
Closed
CRE-016
LGSS Allocated Volume Change
Anne Costille
Implemented and Closed
Class 2
Closed
CRE-018
Cryostat Specification Update to v2
Implemented and Closed
Class 1
Closed
CRE-022
Spectrograph Specification Update to v2
Implemented and Closed
Closed
CRE-021
IRW Specification Update to v2
Implemented and Closed
Closed
CRE-020
IFU Specification Update to v2
Implemented and Closed
Closed
CRE-019
Pre-Optics Specification Update to v2
Hermine Schnetler
Implemented and Closed
Class 1
Closed
CRE-023
IFS Cryostat to Pre-Optics Interface Change
Implemented and Closed
Closed
CRE-024
LGSS Camera Change
Implemented and Closed
Closed
CRE-025
LGSS Fold Mirror Mounting Change
Implemented and Closed
Closed
CRE-026
Update to Nominal Field Centres document
Implemented and Closed
Closed
CRE-030
Update to ISS-to-Calibration Module Interface Drawing
Implemented and Closed
Closed
ET-895
HARMONI Volume Allocation
Implemented and Closed
Closed
ET-894
External Surface Temperature
Implemented and Closed
Closed
CRE-029
Updates to Calibration Module and LGSS volume envelopes
Implemented and Closed
Closed
CRE-031
SCAO Dichroic Change
Implemented and Closed
Closed
CRE-033
Implementation of SCAO commisionning camera in the HCM
Implemented and Closed
Closed
CRE-032
Implementation of a Fixed ADC in the HCM
Implemented and Closed
Closed
CRE-034
Updates to Interface Control Dossier
Implemented and Closed
Closed
CRE-035
Change to the Exit Pupil position of the FPRS
Implemented and Closed
Closed
CRE-036
Updates to LGSS Requirements
Implemented and Closed
Closed
CRE-037
Change to Coordinate system in FPRS to LGSS Optical interface
Implemented and Closed
Closed
CRE-038
Update to IFS Requirements Specification
Implemented and Closed
Closed
CRE-039
Update to Infrared Science Detector Module Requirement Specification
Implemented and Closed
Closed
CRE-040
Update to Visible Science Detector Module Requirement Specification
Implemented and Closed
Closed
CRE-046
Mechanical ICD between ESE and ISB of NGSS
Implemented and Closed
Closed
CRE-042
Increase in power allocation for HARMONI components in ELT computer room
Implemented and Closed
Closed
CRE-043
NGSS Requirements Update
Implemented and Closed
Closed
ET-1004
Update from v3-v4 of data flow for ESO observatories Deliverable Standard
Implemented and Closed
Closed
ESO-382155
ALICE and LISA camera requirements
Implemented and Closed
Closed
CRE-044
MUDPI Request for Deviation (RfD)
Implemented and Closed
Closed
CRE-045
(RfD) LGSS Camera Requirements for ESO
Implemented and Closed
Closed
ET-1233
Update of the Nasmyth Platform Floor Level Tolerancing
Implemented and Closed
Closed
CRE-048
Change to the FPRS-IOE Seal ICD
Implemented and Closed
Closed
CRE-049
Changes to IRW and ICR Requirements post FDR
Implemented and Closed
Closed
CRE-051
Changes to LGSS Requirements post FDR1
Implemented and Closed
Closed
CRE-050
HCS-LGSS Mechanical Interface Change
Implemented and Closed
Closed
CRE-052
New version ICD HRM-DWG-3200-2400-097_A to Version B
Implemented and Closed
Closed
ET-1159
Conflict HARMONI Design Volume vs MS Alt Cable Wrap Access
Implemented and Closed
Closed
CRE-054
Changes to LGSWFS Properties in HRM-00220
Implemented and Closed
Closed
CRE-058
Updates to IRW and ICR Mechanical Interface Drawing
Implemented and Closed
Closed
CRE-060
Change in HARMONI Space Envelope
Implemented and Closed
Closed
CRE-061
Change in FPRS-NGSS Temperature
Implemented and Closed
Closed
CRE-063
Changing Thermal Background Requirement
Implemented and Closed
Closed
ET-1292
Reduction of HARMONI Design Volume
Implemented and Closed
Closed
CRE-065
Change to LGSS Space Envelope
Implemented and Closed
Closed
CRE-068
IPO requirements update
Anna MacIver
Implemented and Closed
Closed
CRE-069
IFU requirements update
Anna MacIver
Implemented and Closed
Closed
CRE-072
VSDS requirements update
Anna MacIver
Implemented and Closed
Closed
CRE-071
ISDS requirements update
Anna MacIver
Implemented and Closed
Closed
CRE-073
NGSS to IFS optical ICD
Implemented and Closed
Closed
CRE-074
IFU to ISP optical interface
Magali Loupais
Implemented and Closed
Class 2
Closed
CRE-078
IPO space envelope update
Anna MacIver
Implemented and Closed
Class 2
Closed
ET-1340
Definition of Cut-Outs in the NP Floor for Various Supply Lines [HARMONI]
Implemented and Closed
Closed
CRE-079
Verification method on LGSS requirements
Anne Costille
Implemented and Closed
Class 2
Closed
CRE-082
Clarification of LDM Requirements
Anne Costille
Implemented and Closed
Class 2
Closed
CRE-084
Update to IFU Space Envelope
Anna MacIver
Implemented and Closed
Class 2
Closed
CRE-089
LDM ICD and Allocated Volume
Implemented and Closed
Closed
CRE-095
Minor updates to ISS Requirements
Implemented and Closed
Closed
CRE-096
LDM Allocated Volume
Implemented and Closed
Closed
CRE-098
Minor Modifications to SCAOS to HCM Optical ICD
Implemented and Closed
Closed
CRE-100
Minor Modifications to HCM SCAOS Mechanical
Implemented and Closed
Closed
CRE-101
Updated AOCU to CM ICD Drawing
Implemented and Closed
Closed
CRE-017
Rationalisation of Instrument Co-ordinate Systems
Fraser Clarke
Rejected - Pending rework
Class 1
Closed
CRE-053
New version of HRM-00145 Systems Engineering Management Plan.
Rejected - Pending rework
Closed
CRE-055
IRW Allocated Volume Change
Rejected - Pending rework
Closed
CRE-006
Addition of Pointing Camera
Fraser Clarke
Rejected and Closed
Class 1
Closed
CRE-014
Clarification and Harmonisation of Product Numbering Scheme
Andy Born
Rejected and Closed
Class 1
Closed
CRE-041
Addition of NGSS Access Fixtures on IFS
Rejected and Closed
Closed
CRE-047
Change to the FPRS Envelope
Rejected and Closed
Closed
CRE-059
NGSS-HCM Product Numbers
Rejected and Closed
Closed
CRE-062
FPRS-LGSS Dichroic Change
Rejected and Closed
Closed
CRE-076
ICR to ESE mechanical interface drawing updates
Anna MacIver
Rejected and Closed
Closed
CRE-088
IRW to NP Mechanical Interface Changes
Anna MacIver
Rejected and Closed
Closed