CRE Details
-
CRE Identifier:
RFD-001 (CRE-103)
Title of CRE:
NIR Camera Wavefront Error
CRE Class:
Status
Awaiting CCB Review
CRE Owner
Sharepoint Link
CRE Folder (SharePoint)
Affected Documents listed in CRE
New/Updated Documents listed in CRE
No New Documents Listed!CRE Notes
- FC 2024-05-30: Created folder and pre-populated RFD form
- VFW 2024-07-09: CCB Review, Eduard has not modified the design from what was approved when five lens was accepted. Should confirm the tolerance analysis properly covers the alignment procedure. Get an update from Eduard on the current status of the tolerance analysis. Need to ensure the request for deviation applies to a specific version of the model, including tolerances. Review the trade-off study to ensure it represents the latest information and can then use it in the justification if necessary. Update the tolerance analysis to document expected performance levels. Stephen to contact Eduard for an update and check the status of the Monte Carlo set submission before this is signed-off. Action to identify exactly which documents / models define the camera design we are granting a deviation (these will then need to be firmly fixed and baselined, and subject to formal change request if needed).
- 2024-10-30 VFW: Chased Anna for an update.