CRE Details
-
CRE Identifier:
CRE-068
Title of CRE:
IPO requirements update
CRE Class:
Status
Implemented and Closed
CRE Owner
Anna MacIverSharepoint Link
CRE Folder (SharePoint)
Affected Documents listed in CRE
Resource Identifier Version Document Name Main Author Status More Info PDF Link HRM-00178 2 IFS Pre-Optics Requirements Specification Hermine Schnetler, UK ATC Released New/Updated Documents listed in CRE
Resource Identifier Version Document Name Main Author Status More Info PDF Link HRM-00178 3 Not found in the Database     CRE Notes
- 03/23 : Discussed briefly at CCB on 30/03/23. Need feedback from sub-system teams.
- 11/23 : Feedback from Elvio. Waiting for Miguel too. Changed owner from Hermine->Anna
- 12/23 : Miguel accepted
- 12/23 : Waiting feedback from Stephen
- VFW 02-24: Still waiting for Stephen Todd
- VFW 2024-03-04: FCL chasing Stephen Todd
- FC 2023/03/11: Stephen Todd approved. Moved to accepted for implementation
- VFW 2024-07-24: WCS questions to Fraser on updated distortions requirement changed from 2% to 0.5%. FCl: 2% to 0.5% came from previous IFS SE, reallocation proved unnecessary once it was better understood how the IFU was reporting its distortion numbers.
- VFW 2024-07-24: Phil thinks 0.5% is not necessary and thinks this change should be removed.
- VFW 2024-09-04: Anna - There is this budget of 0.5% in the tech budget requirement. Which is also flown to IFS req spec.
- VFW 2024-09-23: Anna proposed way forward - update IPO requirements, update to tech budget, opne new CRE to flow down pre-calibration requirement to IFS, distribute and update the IFS sub-system specs.
- VFW 2024-09-23: Fraser will draft a clarification and send to James to put into his working draft. This CRE should now be moved to In-progress
- VFW 2024-10-14: Anna to update budget later.
- 2024-10-15 VFW: Calum endorses Anna's plan (as per 12 Sep). Update Tech budgets, WCS analysis and associated requriements later building on James Stevenson's work.
- 2024-10-15 VFW: Calum endorses Anna's plan (as per 12 Sep). Update Tech budgets, WCS analysis and associated requriements later building on James Stevenson's work.
- 2024-10-23 VFW: Anna updated rationale 0.5% is the pre-calibration distortion requirement is as specified in AD2 section 18.3. Meenu updated in DOORS. VFW uploaded updated draft to HRM SP. Requested Anna to send updated draft to IPO Team.
- 2024-11-19 VFW: Anna circulated draft to IPO Team. VFW requested to do PA/QA check.
- 2024-11-20 VFW: Phil completed QA/PA check and this CRE has now been implemented and is closed.