CRE Details
-
CRE Identifier:
ET-1292
Title of CRE:
Reduction of HARMONI Design Volume
CRE Class:
Status
Implemented and Closed
CRE Owner
Sharepoint Link
CRE Folder (SharePoint)
Affected Documents listed in CRE
New/Updated Documents listed in CRE
CRE Notes
- MA: Opened on 09-01-2022
- FC 02/23 : Internal reviews show this is OK for our volumes. Needs an (acceptable) change to the LGSS volume and design, and commensurate impact of CM extraction path (seems feasible). ISS being redesigned anyway, and can cope with the change. Ready for CCB review
- FC 03/23: Accepted at CCB . Signed version of form returned to ESO
- FC 03/23: ESO provided updated draft of drawing - DMO / JST approved.
- FC 04/23: ESO returned part 3 - no drawing released yet.
- FC 06/08 : Drawings received from ESO and distributed internally. LGSS/CARS volume change needs to be accepted in turn with this. Draft drawings in CRE folder...
- FC 08/23 : LGSS drawings updated and released (CRE-065). Prompted JST and DMO to sign CARS volume drawings. Remaining then is updating references.
- FC 08/23 : Clarifications suggested to drawings by DMO. Changes made by JCA and new drawings uploaded to folder - awaiting response from JST/DMO.
- FC 09/23 : HRM-DWG-300000-0000-00_B and HRM-DWG-330000-0000-00_B signed and released. CIDL and ICDossier updated.
- VFW 10/23: Linked to ET-1159 and CRE-060. FCl to email JCa. Calibration module released, CARS module released. Check implementation for drawings. FCl will update and notify VFW who will circulate an email.
- FC 11/23 : All implementation done, other than to confirm if CM volume needs to be updated or not (emailed Jamie and Jonathan). Jamie confirmed that CM volume is OK as is. Ready for CIB
- FC 11/23 : Closed at CIB 2023/11/21